HUONG LINH 7 WIND FARM

HUONG LINH 7 WIND FARM

  • Investor

    Huong Hoa district, Quang Tri province

  • Place

    Huong Hoa district, Quang Tri province

  • Execution time

    2020 - 2021

  • Scale

    29.4MW

  • Work

    EPC Contractor

HUONG LINH 7 WIND FARM
HUONG LINH 7 WIND FARM
HUONG LINH 7 WIND FARM
HUONG LINH 7 WIND FARM
HUONG LINH 7 WIND FARM
HUONG LINH 7 WIND FARM
Back